Steel Formwork Quay "Ee Frame"
Steel frame revetment responding to environmental and cost reduction.
This construction method involves assembling a lightweight main sheet with joint fittings and bolts to create a framework, filling it with infill material to maintain flood control functionality. The components are lightweight, and assembly and installation are simple tasks that only require bolted connections. Even when installing a top cover, it can be easily connected using super clips, demonstrating excellent workability.
- Company:東王技研
- Price:Other